Temporary classrooms

A temporary classroom is a modular unit put on site for a fixed period: a bulge year, a decant while a block is rebuilt, or space while a permanent scheme is funded. Most schools hire them; some buy a used unit and sell it on. Published hire rates start at £275 a week for a 64 m² single classroom, and one supplier's minimum hire is 26 weeks.

Ask for prices

A free matching service, not a modular building supplier. We find one who covers your area and tell you who they are before anything is shared. How it works

Hire, single classroom
From £275 a week64 m², about £14,300 a year before extras
Minimum hire
26 weeksOne supplier’s stated minimum
Buy refurbished single
From £82,000Building only, excluding VAT
Planning
Usually neededOften a time-limited permission
Figures are a guide, not a quote. Excluding VAT unless stated.Sources read October 2026

What temporary classrooms cost

Hire rate from Elite Systems GB; purchase prices from Midlands Portable Buildings’ April 2026 price guide. Contract values as published on the Liverpool and Stockton-on-Tees notices: they include installation and groundworks and vary widely with toilets, ground and term. Read 28 October 2026. A guide, not a quote, excluding VAT.

Work out a budget

ItemTypical figure
Hire, single 64 m² classroom
Published weekly rate, one supplier
From £275/wk
Two classrooms, four years’ hire
Further education college contract, 2025, with installation and groundworks
£53,118
Three classrooms and a toilet block, about 13 months
Council contract, 2024, with groundworks and installation
£347,128
Buy refurbished single
Published starting price, building only
From £82,000
Buy refurbished double
Published starting price, building only
From £136,800

What schools use temporary classrooms for

  • A bulge class for one cohort, moving up the school year by year.
  • Decant space while a block is refurbished, rebuilt or made safe.
  • Extra rooms while a permanent extension goes through design and funding.
  • Exam halls, intervention rooms or a sixth form base for a set period.
  • Replacing a room lost to a fire, flood or failed roof at short notice.
  • Testing demand for a new provision before committing capital.

What to put in the brief

Ask every supplier to price the same points in writing, so the returns can be compared line by line.

Hire terms
The weekly rate, the minimum term, delivery and collection charges, what happens at the end, and whether part of the hire can go towards buying.
What the price covers
Building, delivery, crane, foundations, drainage, power and water connections, ramps and steps, furniture and removal. Starting prices often cover the building alone.
Rooms and sizes
Each room's floor area against Building Bulletin 103: 55 to 62 m² for a primary class of 30, and the toilets, store and lobby counted separately.
Regulations and fire
Who applies for building control, the fire strategy and escape distances, accessible toilet provision and what the building is rated for.
Programme
Dates for survey, design sign-off, planning, manufacture, delivery and handover, and what happens if a date slips.
Removal and reinstatement
Who disconnects services, cranes the units out and makes good the ground, and what that costs at the end of the term.

Need classrooms for a set period? Tell us how many rooms and for how long, and we will find a supplier who covers your area.

Ask for a free quote

How a temporary classroom gets on site

  1. Brief and budget

    2 to 4 weeks

    Pupil numbers, rooms, toilets, where it sits and the date it must be in use. Agree the funding route and whether the spend needs three quotes, a tender or a framework.

  2. Site visit and returns

    2 to 4 weeks

    Suppliers check access for a lorry and crane, ground levels, drainage, power and water, then return a drawing, a specification and a price.

  3. Planning

    8 to 12 weeks

    Most temporary classrooms need a planning application, often granted for a limited number of years. Allow time for it in the programme.

  4. Delivery and fit-out

    1 to 2 working days on site

    Modules arrive by lorry and are craned on to the foundations. One supplier allows 1 to 2 working days for this and 5 to 7 working days more for fit-out.

  5. Removal

    end of term

    Services are disconnected, the units are lifted out and the ground is reinstated, usually in a holiday.

Questions people ask

Do temporary classrooms need planning permission?

Usually, yes. The Part 4 permitted development right for temporary buildings covers buildings needed while construction work is going on, and they must be removed when that work ends. A classroom for a bulge year or a longer stay normally needs an application, often granted for a fixed number of years.

Do they need building regulations approval?

Yes, in almost every case. The building regulations exemption for temporary buildings applies only to buildings that will stay for no more than 28 days. A classroom that stays a term or more needs approval like any other building.

Is it cheaper to hire or buy?

For a short stay, hire. At £275 a week, a single classroom costs about £14,300 a year before delivery, installation and removal, against £82,000 to buy refurbished. Over several years buying can win, especially if you can sell the unit on. See classroom hire for the sums.

How quickly can a temporary classroom be in place?

The craning and fit-out take days: one supplier allows 1 to 2 working days to install and 5 to 7 working days to fit out. Survey, building control and any planning application take longer, so allow several months for a September start.

Can a temporary classroom have toilets?

Yes. Units with toilets, or a separate toilet block, are common. They need drainage and water connections, which add to the groundworks and the price. Ask for them as separate lines.